Project Name: Design of a large refining complex
Company Name: NEFTEKHIMPROEKT CJSC
Region | Nizhny Novgorod, Russian Federation |
---|---|
Dates | 2018 |
Scope | Project scope included detail design of 200 equipment units: tanks, columns, reactors, heat exchangers. |
Project Specific | Copmany had to design the equipment based on GOST and ASME Standards. |
PASS software used | PASS/EQUIP, PASS/NOZZLE-FEM |
How PASS software helped in the project execution | Previously the company used less effective software for pressure vessels analysis. PASS software significantly reduced the time for producing FEED documentation. E.g, time required for vessels design was reduced from two weeks to two days. Positive experience of PASS/EQUIP Vessel usage drove the company to start using of PASS/EQUIP Nozzle-FEM. Previous experience with other FEM software required significant time and efforts while PASS/EQUIP Nozzle-FEM perfectly solves all intricate task quickly and easily, significantly reducing the calculation time. |
Results | All documentation was issued on time and met the requirements of domestic and foreign design standards. |
NEFTEKHIMPROEKT CJSC is a design organization developing design and complete working documentation for the construction of oil refining and petrochemical facilities, storage and shipment of oil and oil products, technical assistance in ordering equipment and construction and installation works.
CJSC NEFTEKHIMPROEKT have built more than 50 large technological facilities.
The customers of CJSC NEFTEKHIMPROEKT are enterprises of the leading oil companies: OAO Gazprom Neft, OAO LUKOIL, OAO NKRosneft, OAO Zarubezhneft, OAO TNK-BP, OAO Slavneft, JSC Antipinsky Oil Refinery, Mozyr Oil Refinery OJSC, TATNEFT PJSC and others.